|
Nov 24, 2024
|
|
|
|
CNET 3190 - Construction Scheduling
3 hours (2;3)
Study of construction scheduling utilizing current techniques including Critical Path Method (CPM), the Precedence Method (PM), the Program Evaluation and Review Technique (PERT) and a probabilistic method.
Prerequisite(s): CNET 3160 .
Add to My Catalog (opens a new window)
|
|